flowshop
基本解釋
- 流水車間
英漢例句
- At last thealgorithms are tested against by 21 Rec FlowShop problems. Also, the topologycharacteristics and the performance are analyzed as well.
最后針對21個Rec類FlowShop問題進行實證分析,分析了該類問題的拓撲空間特性以及雜交算法性能的改進情況。 - Multi-Objective Local Search(MOLS) algorithm was proposed to solve the permutation flowshop sequencing problem with bi-objectives of makespan and total flowtime.
針對求解最小化最大完工時間和總流程時間的多目標同順序流水作業(yè)問題,提出了一個多目標局部搜索算法。 - Abstract: To solve the no-wait flowshop scheduling problem to minimize total tardiness with rule scheduling methods, it is necessary to compute every job's complete time.
中文摘要: 在使用規(guī)則調度方法求解無等待最小化總拖期流水車間調度問題時,前提是計算工件的完工時間。 - Computational results show that the proposed DPSO algorithm with the two-point inheritance scheme is very competitive for the lot streaming flowshop scheduling problem.
實驗結果顯示,利用兩點繼承機制的改善后DPSO演算法,在此排程問題上呈現(xiàn)最好的績效。 - Then, we consider an n-job, m-machine lot streaming problem in a flowshop with equal-size sublots where the objective is to minimize the total weighted earliness and tardiness.
接著,我們考慮一個在n件工件及m部機器下,批量流在流程型工廠之排程問題,其目標是最小化總加權提早及延遲時間。