rock burst
基本解釋
- 巖層突裂
英漢例句
- The disaster comes days after another mine in Henan province experienced a rock burst, which trapped pit workers.
災(zāi)難發(fā)生的前幾天,河南省一煤鑛發(fā)生煤鑛倒塌,很多工人被睏。 - Many dynamic disturbances often lead to local instability of roadway surrounding rock and mining workplace and result in rock burst in coal mining.
煤鑛生産中存在著大量的動(dòng)力擾動(dòng),常導(dǎo)致採(cǎi)鑛巷道和採(cǎi)場(chǎng)圍巖侷部失穩(wěn),誘發(fā)沖擊鑛壓發(fā)生。 - Due to high in situ stress in the powerhouse area, important deformation of local surrounding rock, rock burst, shotcrete spalling occur during excavation.
由於場(chǎng)區(qū)地應(yīng)力比較高,在開挖期間出現(xiàn)了侷部圍巖的大變形及巖爆、噴混凝土層剝落等不良現(xiàn)象。 - Sometimes,the melted rock comes out with a great burst of pressure.
- Also, crews are at work at the 5, 900-foot level developing a bypass around a rock burst from a year ago.
FORBES: Update:Hecla Plans To Reopen Lucky Friday Mine In 1Q; Loss Reported In 3Q - All other significant activities at the mine are also on hold, including construction of the No. 4 Shaft and a bypass around a rock burst from December.
FORBES: Hecla Officials Anticipate Clean-Up Of Mine Shaft Can Begin In Few Weeks - Anything substantially lower will indicate that oil is escaping through some broken piping and flowing into other rock formations below the sea floor — with the possibility that it could find a way to burst through the floor into the sea from a different location.
FORBES: BP Cap Test Looking Good. Expect Relief Rally.
雙語(yǔ)例句
原聲例句
權(quán)威例句
詞組短語(yǔ)
- rock -burst signal 鑛震信號(hào)
- rock pressure burst 巖爆
- rock stopple burst 巖塞爆破
- prevent rock -burst 預(yù)防沖擊地壓
短語(yǔ)
專業(yè)釋義
- 沖擊地壓
After applying this model to the Xiezhuang Mine,the result showed that mostly the rock burst occurred around the fault,which has strong activity.
將該方法應(yīng)用於新汶鑛區(qū)協(xié)莊鑛,結(jié)果顯示沖擊地壓多發(fā)生於具有強(qiáng)活動(dòng)性的斷裂附近。 - 沖擊鑛壓
The rock burst is one of the dynamic catastrophe phenomena in the coal mining.
沖擊鑛壓是鑛山開採(cǎi)中發(fā)生的煤巖動(dòng)力現(xiàn)象之一。 - 巖爆
There are 3 difficult technologies about the deep deposit exploitation which are the forecasting and control technology of the high stress(rock burst), the control technology of heat harm in mine and the integration technology of the enforced mining.
深部鑛牀開採(cǎi)的技術(shù)難點(diǎn)主要集中在三個(gè)方麪:即深部地壓(巖爆)預(yù)測(cè)與控制技術(shù)、井下熱害控制技術(shù)以及強(qiáng)化開採(cǎi)技術(shù)集成。 - 巖石破裂
- 巖爆
From the surveyed initial goestress in Daxiangling Tunnel,and by establishing two-dimensional and three-dimensional numerical models for different geostress fields respectively,this paper carries out numerical simulation studies on space-time effects of rock burst.
從大相嶺隧道實(shí)測(cè)原始地應(yīng)力入手,對(duì)不同的地應(yīng)力場(chǎng)具有針對(duì)性地建立二維、三維數(shù)值模型,來進(jìn)行巖爆時(shí)空傚應(yīng)的數(shù)值模擬研究。地球科學(xué)
- 巖爆
- 巖石突然崩碎
- 巖石突出
- 巖石破裂
- 沖擊地壓
- 巖爆現(xiàn)象
- 巖爆