rolling wave planning
常見例句
- This progressive detailing of the project management plan is often called "rolling wave planning, "indicating that planning is an iterative and ongoing process(see Figure 3-7).
使項目管理計劃逐步詳細(xì)和深入的方法常常叫做“滾動式規(guī)劃”,表明規(guī)劃是重復(fù)多次的連續(xù)過程(見圖3-7)。 返回 rolling wave planning