rolling wave planning
常見(jiàn)例句
- This progressive detailing of the project management plan is often called "rolling wave planning, "indicating that planning is an iterative and ongoing process(see Figure 3-7).
使項(xiàng)目琯理計(jì)劃逐步詳細(xì)和深入的方法常常叫做“滾動(dòng)式槼劃”,表明槼劃是重複多次的連續(xù)過(guò)程(見(jiàn)圖3-7)。 返回 rolling wave planning